News & Press Releases

News & Press Releases


Primetals Technologies' largest automation upgrade to date implemented at Taiyuan Group in China

  • Process optimization upgrade for the entire meltshop and casting areas including two LD converters (BOFs), two electric arc furnaces, three AOD converters, and seven slab casters
  • Central control station ensures "one-button steelmaking"
  • System changes completed within one week

Primetals Technologies’ most extensive upgrade of process optimization systems to date was recently implemented at Taiyuan Iron and Steel Group Co’s (TISCO) steel plant in Taiyuan, Shanxi Province, China. Switching to the new systems took just one week and was accomplished remotely, marking project completion two months ahead of schedule.

Fully automated plant

Primetals Technologies upgraded the Level 2 automation systems at 14 steelmaking units across the entire meltshop, seven continuous slab casters, and the central management system for raw-material logistics and evaluation. This comprehensive modernization enables TISCO to execute the steel-production process from a central control center, also sometimes called “integrated control center” (ICC). The upgrade ensures full plant automation, "one-button steelmaking", as all systems are connected to the same unified network.

Improved performance

The modernization of the Level 2 systems makes it possible for TISCO to calculate process parameters even more accurately using modern metallurgical models, which will improve the quality, productivity, and flexibility of TISCO’s production process.

The software system features a significantly improved user interface – the new version is easier to navigate and more intuitive for operators. In addition, the new interface simplifies the communication between the systems as well as the future implementation of extensions. The servers are virtualized, meaning that the process optimization solutions are operated without hardware, which in turn reduces the need for IT-related maintenance.

Wide-ranging upgrade

TISCO’s Taiyuan site is one of the world’s largest steel plants. Primetals Technologies has upgraded the process optimization software on 20 units in total: two electric arc furnaces, three AOD converters, one twin VOD plant, three twin ladle furnaces, two LD converters (BOF) including a ladle stirring station, two twin-RH vacuum degassing systems, and seven continuous slab casters.

Developing special steels

Founded in 1934, TISCO is a holding subsidiary of China Baowu Iron and Steel Group. The company has long focused on the development of special steels such as ultra-wide, ultra-thick and ultra-thin strip tubes, spring steel, hand tear steel, core steel, railway steel, duplex stainless steel, and high-quality silicon steel for electric vehicles.

Primetals Technologies has implemented its largest ever upgrade of process optimization systems in a single steel plant at TISCO’s Taiyuan site in China. Copyright: TISCO.

Primetals Technologies, Limited, headquartered in London, United Kingdom, is a pioneer and world leader in the fields of engineering, plant building, and the provision of lifecycle services for the metals industry. The company offers a complete technology, product, and services portfolio that includes integrated electrics and automation, digitalization, and environmental solutions. This covers every step of the iron and steel production chain—from the raw materials to the finished product—and includes the latest rolling solutions for the nonferrous metals sector. Primetals Technologies is a joint venture of Mitsubishi Heavy Industries and partners, with around 7,000 employees worldwide. To learn more about Primetals Technologies, visit the company website www.primetals.com.