News & Press Releases
-
London, January 16, 2018
Primetals Technologies receives final acceptance for modernization of electric arc furnace from EVRAZ ZSMK
In November, EVRAZ Consolidated West Siberian Metallurgical Plant (EVRAZ ZSMK) issued the final acceptance certificate for an electric arc furnace modernized by Primetals Technologies. Electric arc furnace no. 2 is providing with blooms the EVRAZ ZSMK rail mill located in Novokuznetsk, Siberia.
more
-
London, January 11, 2018
HKM orders two new ladle heating stations from Primetals Technologies
Hüttenwerke Krupp Mannesmann GmbH (HKM), a German steel producer, has awarded Primetals Technologies an order to supply two new ladle heating stations for the LD basic oxygen furnace plant at its Duisburg-Huckingen location.
more
-
London, December 21, 2017
Primetals Technologies receives FACs for four continuous casters from Formosa Ha Tinh Steel Co.
Within a period of three days in early June, Primetals Technologies commissioned three continuous casters for the Vietnamese Formosa Ha Tinh Steel Corporation, a subsidiary of the Taiwanese steel producer Formosa Plastic Group.
more
-
London, December 19, 2017
Primetals Technologies to supply two continuous slab casters and a hot rolling mill to the JSW Steel Dolvi plant
Primetals Technologies has won an order from JSW Steel Ltd., an Indian steel producer, to supply two continuous slab casters to its Dolvi plant in Maharashtra. Together, the two two-strand casters will have an initial annual capacity of around 4.5 million metric tons of slabs with future capacity potential for 6 million metric tons.
more
-
London, December 14, 2017
Primetals Technologies to supply two continuous slab casters to the new HBIS Laoting plant
Chinese steel producer HBIS Laoting Steel Co. Ltd. has ordered two new, twin-strand continuous slab casters from Primetals Technologies.
more